Saturday, August 6, 2011

my thoughts on itp

i felt this whole itp has made me a better person. i have learnt a bunch of stuff and get to experience the real working world. though there have been times when things were not so smooth, it is insignificant compared to the things i have learnt and also the friends i have made.

however there is one thing which could have made itp a better experience for students. currently there is no grade given for itp. if a grade is given students would be even more motivated to do their best.

overall i would rate my itp 7/10.

week 16 - last week of itp

the last week of itp was also quite hectic. the boss gave a task to do, which is to do a powerpoint portfolio of the events the company had organised. it took the whole week to finish the task.
also we had a new colleague to replace the girl who went the week before. on the end of the week we had to do setup for 4 roadshows. which is really stretching me to my limits especially as i'm fasting. however i managed to hold on and finally the week is done. which means the end of itp.. HOORAY!!!

week 15 - not in office the whole week

week 15 can be considered a unique week as we were not in the office at all. instead we were stationed at balmoral plaza where we had to do installation works for a new club called Melody Valley. we had to install the lightings etc..it took three whole days.

on thursday i had to man the sound system at safra yishun where they have the asia rock climbing youth championships. the bad news is that i had to take turns with joel to man the staion solo. i took the first shift (thursday) and he took the second (friday). we did it together on saturday. i was a wreck when it did not manage to get the sound system going. i started to call everyone, from joel to my supervisor and even the boss. as it turns out, one of the wires were loose. after fixing the problem, everything went smoothly until it rains. i started to panic again. luckily i had help from the people there who helped to cover the speakers with the trash bags. the rain also caused the event to be delayed by a few hours.

week 14

we setup the kinect booth and man it the whole day. however hardly anyone used it which is quite disappointing. on the other hand we get to eat the hotel buffet which is not so bad

week 12 & 13

week 12
we did a setup for nueva cuba which is celebrating their anniversary. other than that, we also have a roadshow during the weekend.

week 13
we had an event at swissotel where we had to setup a kinect booth the following week so we prepare the necessary stuff beforehand

week 11 - Grandest event so far..

we had to prepare for another cat event, this time their annual dinner. for this event we had to prepare a lot of stuff. besides the usual sound system, we also had to bring lighting equipment and their stands, trusses etc. the stuff are all very heavy and it took us the whole morning plus half the afternoon to setup the entire place. the event started in the evening and ended around 9 plus. during teh event we get to watch performances like sand artists which is quite impressive. the next day after the event we had half a day off as we were all still tired from the event

during the weekend, we did not have a roadshow. instead we do setup of the sound system at safra yishun where they have an event going on.

week 10

another week in the office just doing office stuff..boring

week 9

week 9 is a damn hectic week cause we had two events to run in the same week. thats right, TWO events in the SAME week.
 the first is the estee lauder event where they are celebrating the opening of a new distribution centre. the event is held at the CWT building, penjuru road. for this event we are more involved. we had to be the carriers of the plaques which would be given out to the directors which meant we got to go on stage.
the next event is called the TUMI event. it is not like the previous events we have done like official openings, ceremonies. instead it is a fashion show. we are the av guys there and we have to manage the sound system.

week 7-8

on week 7 and 8, we stayed in office the whole time and only went out during the weekends to do setup for the roadshows..basically a boring couple of weeks.....

week 6 - major event!!

we had a major event on week 6 which is the Cat reman opening. Cat is short for Caterpillar and it is apparently a famous company in the construction industry. the event is held at jurong. my job is to help out in ensuring the whole event runs smoothly. on the day before the event (monday) we had to setup the pa system and also arrange all the chairs properly. luckily we did not need to lay the carpet cause the area is very large and we would surely mess it up if we were to do it. on the event day itself, everything went smoothly and we also got to eat the food. then we had to stack up the chairs for the chair people to collect which is very tiring.
this is the first major event that we have been a part of so im glad that we managed to run it well.