Saturday, August 6, 2011

week 12 & 13

week 12
we did a setup for nueva cuba which is celebrating their anniversary. other than that, we also have a roadshow during the weekend.

week 13
we had an event at swissotel where we had to setup a kinect booth the following week so we prepare the necessary stuff beforehand

week 11 - Grandest event so far..

we had to prepare for another cat event, this time their annual dinner. for this event we had to prepare a lot of stuff. besides the usual sound system, we also had to bring lighting equipment and their stands, trusses etc. the stuff are all very heavy and it took us the whole morning plus half the afternoon to setup the entire place. the event started in the evening and ended around 9 plus. during teh event we get to watch performances like sand artists which is quite impressive. the next day after the event we had half a day off as we were all still tired from the event

during the weekend, we did not have a roadshow. instead we do setup of the sound system at safra yishun where they have an event going on.

week 10

another week in the office just doing office stuff..boring

week 9

week 9 is a damn hectic week cause we had two events to run in the same week. thats right, TWO events in the SAME week.
 the first is the estee lauder event where they are celebrating the opening of a new distribution centre. the event is held at the CWT building, penjuru road. for this event we are more involved. we had to be the carriers of the plaques which would be given out to the directors which meant we got to go on stage.
the next event is called the TUMI event. it is not like the previous events we have done like official openings, ceremonies. instead it is a fashion show. we are the av guys there and we have to manage the sound system.

week 7-8

on week 7 and 8, we stayed in office the whole time and only went out during the weekends to do setup for the roadshows..basically a boring couple of weeks.....

week 6 - major event!!

we had a major event on week 6 which is the Cat reman opening. Cat is short for Caterpillar and it is apparently a famous company in the construction industry. the event is held at jurong. my job is to help out in ensuring the whole event runs smoothly. on the day before the event (monday) we had to setup the pa system and also arrange all the chairs properly. luckily we did not need to lay the carpet cause the area is very large and we would surely mess it up if we were to do it. on the event day itself, everything went smoothly and we also got to eat the food. then we had to stack up the chairs for the chair people to collect which is very tiring.
this is the first major event that we have been a part of so im glad that we managed to run it well.

Sunday, June 12, 2011

week 4 and 5

really overdue posts..supposedly to be every week but got so busy until there's no time so i'll squeeze out as much as i can.

week 4
quite slack. since i have finished all the accounting for the boss, she gave me a new assignment. alas, it is to build a database of contacts using excel spreadsheet. the targets are schools, pubs and local av equipment companies. honestly, i cant see the link between those three but who am i to argue? what the boss wants the boss gets. so thats the assignment i did for the whole week.
also during the weekend, we have another setup for vitagen, this time at serangoon NEX.

week 5
the first two days of the week was holiday cause monday is to compensate for working last weekend and tuesday was vesak day. but when return to office on wednesday we got busy. first we got to prepare for a big event coming up next week. on thursday we went to eminent plaza (lavender) to do some repairs and setup for a massage parlour. then we go to recce the place for the big event which is in jurong (jln tukang).

so thats what i did for the two weeks..i'll try to get the posts for the coming weeks as soon as possible.