Sunday, February 13, 2011

the rest of tutorial pt2.1

this is the risk analysis tutorial..its quite long so gotta split into two: table(2.1) and short paragraph(2.2)

 
S/N
Risk description
Probability (1= low ,5= high)
Impact (1= low ,5= high)
1)
Equipment malfunction
4
5
2)
What if there is a flight delay and the artist can’t reach in time?
3
2
3)
Unable to sell most of the tickets.
2
4
4)
Power surge
2
3
5)
Artiste feeling sick, unable to perform.
3
5



S/N
Risk description
Risk Category
Ranking (1= low ,5= high)
1)
Equipment malfunction

High Probability, High Impact
5
2)
What if there is a flight delay and the artist can’t reach in time?
High Probability, Low Impact
2
3)
Unable to sell most of the tickets.
Low Probability, High Impact
4
4)
Power surge
Low Probability, High Impact
3
5)
Artiste feeling sick, unable to perform.
High Probability, High Impact
5



S/N
Risk description
Risk
How Probability can be reduced
How Impact can be reduced
1)
Equipment malfunction
1) Delay Concert.

2) Cost of changing of Equipment.
1) Get equipment from well know company.
1) Double check if all equipment is working properly.
2)
Artiste feeling sick, unable to perform.
1) Affecting concert schedule.

2) Audience may not be happy about it.
1) Get in contact with all artistes to ensure that their health condition is alright.
1) Reorganise concert schedule and flow of performances.



*the table is in order of analysis, ranking and assessment

No comments:

Post a Comment